Traffic Advisory: Pavement Testing at Heatherbell Road on Aug. 8

Type(s)
Public Notice

When: Friday, Aug. 8, 2025, 8 - 11:30  a.m. 
Where: Heatherbell Road (between Lagoon Road and Seafield Road)
What: Pavement Testing


Pavement testing will be occurring on Heatherbell Road (between Lagoon Road and Seafield Road). Expect delays with single-lane, alternating traffic during construction hours. 

Traffic control personnel will be on-site. Please reduce speeds, follow directions and posted signage. Two-way traffic will be re-opened after construction hours. Access to all properties in the area will be maintained throughout construction. 

Emergency vehicles will be given priority access at all times.

Location of Works

Image

 

On-Site Contact for the works

Aria Garousi 
GEOPACIFIC Consultants
250-413-7517
garousi@geopacific.ca 

Get details and check traffic maps at www.colwood.ca/Roads