
When: November 6, 2026, to November 18, 2026
Where: Metchosin Road from Ryder Hesjedal Way to Latoria Boulevard
What: BC Hydro Underground Infrastructure Work
Please be advised that BC Hydro underground infrastructure work is taking place on Metchosin Road at the intersection of Ryder Hesjedal Way from November 6 to November 18, 2026, between 7:00 am and 5:00 pm.
Motorists should expect changing traffic patterns throughout the work area. During most of the construction, one lane of Metchosin Road will remain open to through traffic in one direction. Typically, southbound traffic will be detoured via Latoria Boulevard and Ryder Hesjedal Way between 7:00 am and 3:00 pm, while northbound traffic will generally be detoured via Ryder Hesjedal Way and Latoria Boulevard after 3:00 pm.
In addition, full closures of Metchosin Road are scheduled for Thursday November 12, 2026, and Friday November 13, 2026, from 9:00 am to 3:00 pm. During these periods, traffic will be detoured around the work area.
Please reduce your speed, use caution, and follow the directions of Traffic Control Personnel and all posted signage. Allow extra travel time and consider alternative routes where possible.
We appreciate your patience, understanding, and cooperation while this work is completed.
Contact for the works:
John Moniz
24/7 Contact, Chew Excavating
250-883-6658
Angel Rama
Site Foreman, Chew Excavating
250-883-1005
Check the Municipal 511 map for real-time travel information: Traffic Advisories | City of Colwood