When: Tuesday, Sept. 16, 2025 | 9 a.m. - 3 p.m.
Where: 500 block of Latoria Road and Veteran Memorial Parkway to Bezanton Way
What: Concrete Curb Installation – Separated Bike Lane Project
Please be advised that the Capital City Paving Ltd. will be on site re-instating concrete curbs on the 500 block of Latoria Road and Veteran Memorial Parkway to Bezanton Way.
Single lane alternating traffic will be in effect. Please anticipate delays on the roadway while work is being performed.
Traffic control personnel will be on site to organize equipment and vehicle traffic. Please obey traffic signs, reduce speed, and use caution. Use of alternative routes is encouraged.
Emergency vehicles access will be provided at all times.
Location of Works

Contact for the works
Tanner Northrup
Colwood Public Works
250-478-5053 ext. 214
tnorthrup@colwood.ca
Get details and check traffic maps at www.colwood.ca/Roads